Decisions and Findings

Each month, the Certificate of Need Section makes decisions regarding applications under review to either conditionally approve the application or to disapprove it. The Certificate of Need Section also prepares "findings" which explain the basis for the decision.

June 2015

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Alamance G-011015-15 North Burlington Dialysis Center Add no more than two dialysis stations for a total of no more than 16 stations upon completion of this project, Project ID #G-10352-14 (add 3 stations) 6/5/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 424 KB)
Bladen N-011021-15 Southeastern Dialysis Center-Elizabethtown Add no more than two dialysis stations for a total of no more than 26 stations upon project completion 6/15/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 449 KB)
Burke E-011009-15 BMA Burke County Relocate existing facility and add six stations for a total of 31 stations upon project completion 6/12/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 405 KB)
Cabarrus F-011019-15 Copperfield Dialysis Center Relocate the facility to a new location and add four stations relocated from North Charlotte Dialysis Center for a total of 31 stations upon completion of this project and Project I.D. #F-10109-13, (add 6 stations by relocation from Dialysis Care of Kannapolis in Rowan County) 6/8/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 427 KB)
Davidson G-011004-15 Lexington Dialysis Center Add no more than 4 dialysis stations for a total of no more than 34 stations upon project completion 6/5/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 401 KB)
Duplin P-011014-15 Wallace Dialysis Center Add no more than 2 dialysis stations for a total of no more than 16 stations upon completion of this project and Project ID #O-10348-14 (relocate 3 stations to Southeastern Dialysis Center-Burgaw) 6/5/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 444 KB)
Granville K-011006-15 FMS Dialysis Services of Oxford Add no more than 4 dialysis stations for a total of no more than 23 stations upon project completion 6/4/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 297 KB)
Richmond H-011017-15 Dialysis Care of Richmond Co Add no more than 2 dialysis stations for a total of no more than 28 stations upon completion of this project, Project ID #H-11001-15 (relocate 4 stations to Sandhills Dialysis Center) 6/16/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 425 KB)

May 2015

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Gaston F-011008-15 FRESENIUS MEDICAL CARE OF SOUTH GASTON Add no more than six dialysis stations for a total of no more than 26 stations upon project completion 5/5/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 302 KB)
Gaston F-011010-15 Fresenius Medical Care Belmont Add no more than 2 dialysis stations for a total of no more than 18 stations upon project completion 5/5/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 309 KB)
Guilford G-011005-15 BMA of Southwest Greensboro Add no more than 2 dialysis stations for a total of no more than 33 stations upon project completion 5/7/2015 Conditional Approval (PDF, 150 KB) Findings (PDF, 536 KB)
Mecklenburg F-011007-15 BMA Beatties Ford Add no more than 4 dialysis stations for a total of no more than 43 stations upon completion of this project and Project ID #F-10259-14 (add 7 stations) 5/6/2015 Under Review (PDF, 150 KB) Findings (PDF, 504 KB)
Mecklenburg F-011012-15 FMC MATTHEWS Add no more than 8 dialysis stations for a total of no more than 21 stations upon completion of this project and Project ID #F-10369-15 (relocate 8 stations to FMC Regal Oaks) 5/7/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 531 KB)
Onslow P-011002-15 Brynn Marr Hospital Relocate 18 inpatient psychiatric beds from Broughton Hospital pursuant to Policy PSY-1 for a total of 12 adult inpatient psychiatric beds, 60 child/adolescent inpatient psychiatric beds and 12 substance abuse beds upon project completion 5/28/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 351 KB)

April 2015

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Cumberland M-010367-14 Cumberland County Rehabilitation Center Relocate the 58 nursing facility beds from Golden Years Nursing Home and the 36 adult care home beds from Mann Street Residential Care Facility to develop a new combination nursing facility 4/29/2015 Conditional Approval (PDF, 153 KB) Findings (PDF, 420 KB)
Davie G-010372-15 Bermuda Village Retirement Center Constuct addition and renovate existing facility in order to add 12 nursing facility beds 4/10/2015 Conditional Approval (PDF, 153 KB) Findings (PDF, 437 KB)
Martin Q-010361-14 Martin General Hospital Offer inpatient dialysis services 4/24/2015 Conditional Approval (PDF, 149 KB) Findings (PDF, 310 KB)
Mecklenburg F-010370-15 East Mecklenburg Inpatient Unit at Aldersgate Relocate 6 hospice inpatient beds approved in Project ID # F-10132-13 from Levine & Dickson Hospice House in Huntersville to the East Mecklenburg Inpatient Unit at Aldersgate in Charlotte 4/24/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 482 KB)
New Hanover O-010366-14 Liberty Commons Rehabilitation Center Relocate 72 ACH beds within the same county to an existing combination nursing facility for a total of 100 nursing facility and 112 ACH beds upon project completion 4/29/2015 Denied (PDF, 146 KB) Findings (PDF, 407 KB)
Richmond H-011001-15 Sandhills Dialysis Relocate four dialysis stations from Dialysis Care of Richmond County for a total of 16 at Sandhills Dialysis upon project completion 4/6/2015 Conditional Approval (PDF, 176 KB) Findings (PDF, 401 KB)
Rowan F-010371-15 Dialysis Care of Kannapolis Relocate 5 certified dialysis stations from Dialysis Care of Rowan to Dialysis Care of Kannapolis for a total of 25 stations upon completion of this project, Project ID #F-10273-14 (add 1 station) and Project ID #F-10109-13 (relocate 6 stations to Copperfield Dialysis Center) 4/7/2015 Conditional Approval (PDF, 150 KB) Findings (PDF, 428 KB)

March 2015

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Forsyth G-010359-14 Brookstone Terrace Relocate 13 ACH beds from The Crest of Clemmons to Brookstone Terrace and convert 5 existing ACH beds at Brookstone Terrace for a total of 18 beds in a newly constructed special care unit addition 3/30/2015 Conditional Approval (PDF, 154 KB) Findings (PDF, 540 KB)
Mecklenburg F-010369-15 FMC Regal Oaks Develop a new 12-station dialysis facility by relocating eight stations from FMC Matthews and four stations from BMA East Charlotte 3/27/2015 Conditional Approval (PDF, 152 KB) Findings (PDF, 457 KB)
Wayne P-010365-14 Coastal Carolina Dialysis Develop a new 12-station dialysis facility (relocate 10 stations from Goldsboro Dialysis Center and 2 stations from Goldsboro South Dialysis Center) and relocate the existing home training program 3/4/2015 Conditional Approval (PDF, 179 KB) Findings (PDF, 602 KB)

February 2015

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Alamance G-010357-14 Peak Resources-Alamance Inc Relocate 120 nursing facility beds within Alamance County and construct a replacement facility 2/23/2015 Conditional Approval (PDF, 152 KB) Findings (PDF, 390 KB)
Cumberland M-010340-14 BMA Fayetteville Add 3 dialysis stations for a total of 45 dialysis stations upon completion of this project, and Project ID# M10304-14 (relo of facility) and Project ID # M-10191-13 (add 3) 2/25/2015 Conditional Approval (PDF, 152 KB) Findings (PDF, 318 KB)
Franklin K-010353-14 Dialysis Care of Franklin County Add four stations for a total of 27 2/25/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 455 KB)
Hoke N-010345-14 Dialysis Care of Hoke County Relocate one station from Dialysis Care of Richmond County for a total of 28 station upon project completion 2/25/2015 Denied (PDF, 146 KB) Findings (PDF, 483 KB)
Johnston J-010364-14 Clayton Radiation Oncology Acquire a CT simulator for the existing radiation therapy service in Clayton 2/23/2015 Conditional Approval (PDF, 177 KB) Findings (PDF, 390 KB)
New Hanover O-010346-14 Southeastern Dialysis Center Add ten dialysis stations for a total of 29 dialysis stations upon completion of this project and Project ID # O-10324-14 (relocate 10 stations) 2/25/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 395 KB)
Pender O-010348-14 Southeastern Dialysis Center, Inc. - Burgaw Add 3 dialysis stations for a total of 15 dialysis stations upon completion of this projet and Project ID #O-10125-13 (relocate 10) 2/25/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 281 KB)
Wake J-010362-14 Duke Cancer Center Cary Radiation Oncology Replace existing linear accelerator located at Duke Cancer Center Cary Radiation Oncology 2/13/2015 Conditional Approval (PDF, 153 KB) Findings (PDF, 428 KB)
Wake J-010363-14 Duke Cancer Center Macon Pond Replace existing linear accelerator located at Duke Cancer Center Macon Pond 2/13/2015 Conditional Approval (PDF, 152 KB) Findings (PDF, 420 KB)
Wilkes D-010326-14 Wilkes Regional Dialysis Center Add three dialysis stations to the existing facility for a total 24 dialysis stations upon completion 2/23/2015 Conditional Approval (PDF, 152 KB) Findings (PDF, 378 KB)

January 2015

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Alamance G-010347-14 BURLINGTON DIALYSIS Add six dialysis stations for a total of 24 upon completion of this project and Project ID #G-10265-14 (relocate 8) 01/23/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 386 KB)
Alamance G-010352-14 North Burlington Dialysis Add three dialysis stations for a total of 14 dialysis stations upon completion of this project and Project ID G-10265-14 (relocate 2) 01/23/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 387 KB)
Durham J-010350-14 Durham West Dialysis Add four dialysis stations for a total of 30 upon completion of this project and Project ID #J-10319-14 (relocate 3) 01/12/2015 Conditional Approval (PDF, 203 KB) Findings (PDF, 397 KB)
Gaston F-010356-14 Stanley Total Living Center Inc Add 12 new NF beds per Policy NH-2 and 30 new ACH beds per Policy LTC-1 01/16/2015 Conditional Approval (PDF, 204 KB) Findings (PDF, 420 KB)
Lee J-010316-14 Westfield Rehabilitation and Health Center Relocate 20 ACH beds from A Step From Residential Care facility 01/27/2015 Conditional Approval (PDF, 154 KB) Findings (PDF, 472 KB)
Lee J-010335-14 Carolina Dialysis - Sanford Add 3 dialysis stations for a total of 36 dialysis stations 01/23/2015 Conditional Approval (PDF, 150 KB) Findings (PDF, 503 KB)
Onslow P-010351-14 Southeastern Dialysis Center of Jacksonville Add eight dialysis stations(5 via facility need and 3 relocated from Southeastern Dialysis Center - Kenansville) for a total of 33 stations upon completion of this project and Project ID #P-10266-14 (relocate 1) and Project ID #P-10123-13 (relocate 18) 01/30/2015 Conditional Approval (PDF, 152 KB) Findings (PDF, 356 KB)
Pitt Q-010328-14 FMC Care of Ayden Add one dialysis station for a total of 16 dialysis stations 01/16/2015 Conditional Approval (PDF, 203 KB) Findings (PDF, 351 KB)
Pitt Q-010334-14 FMC Dialysis Services East Carolina University Add 10 dialysis stations for a total of 41 dialysis stations upon completion of this project and Project ID #Q-10315-14 01/16/2015 Conditional Approval (PDF, 203 KB) Findings (PDF, 384 KB)
Sampson M-010323-14 Sampson County Home Dialysis Develop a freestanding home training program for peritoneal dialysis patients 01/28/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 364 KB)
Wake J-010318-14 UNC Hospitals Radiation Oncology, Holly Springs Campus Acquire one linear acclerator 01/28/2015 Denied (PDF, 148 KB) Findings (PDF, 768 KB)
Wake J-010320-14 The Prostate Health Center Acquire one linear acclerator 01/28/2015 Conditional Approval (PDF, 151 KB) Findings (PDF, 768 KB)
Wake J-010339-14 BMA of Fuquay Varina Kidney Center Add four dialysis stations for a total of 23 dialysis stations upon completion of project 01/14/2015 Conditional Approval (PDF, 203 KB) Findings (PDF, 319 KB)
Wake J-010343-14 Fresenius Medical Care Eastern Wake Add three dialysis stations for a total of 14 dialysis stations upon completion of this project and Project ID #K-10099-13 01/16/2015 Conditional Approval (PDF, 202 KB) Findings (PDF, 313 KB)
Wayne P-010344-14 Goldsboro Dialysis Add one dialysis station for a total of 27 stations upon completion 01/16/2015 Conditional Approval (PDF, 202 KB) Findings (PDF, 357 KB)

December 2014

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Beaufort Q-010336-14 FMC Pamlico Add six dialysis stations for a total of 31 dialysis stations upon project completion 12/10/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 397 KB)
Catawba E-010332-14 FMC Catawba Valley Add two dialysis stations for a total of 25 dialysis stations upon completion 12/17/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 384 KB)
Davie G-010327-14 Davie Kidney Center Add 3 dialysis stations for a total of 13 dialysis stations upon project completion 12/19/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 379 KB)
Durham J-010329-14 FMC South Durham Add four dialysis stations for a total of 18 dialysis stations upon completion of this project and Project ID #J-10248-14 12/11/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 378 KB)
Gaston F-010354-14 CaroMont Imaging Services-Gaston Day Develop a satellite outpatient imaging department in Gastonia 12/17/2014 Conditional Approval (PDF, 204 KB) Findings (PDF, 344 KB)
Mecklenburg F-010325-14 Huntersville Health & Rehabilitation Center Cost Overrun for Project ID #F-8681-11 12/05/2014 Conditional Approval (PDF, 205 KB) Findings (PDF, 443 KB)
Mecklenburg F-010333-14 BMA OF NORTH CHARLOTTE Add four dialysis stations for a total of 36 stations upon completion of this project and Project ID #F-10249-14 (add two) and Project ID #F-10091-13,(add three) 12/10/2014 Conditional Approval (PDF, 204 KB) Findings (PDF, 461 KB)
Mecklenburg F-010349-14 SOUTH CHARLOTTE DIALYSIS Add three dialysis stations for a total of 23 dialysis stations upon completion 12/05/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 489 KB)
Nash L-010341-14 FMC of Spring Hope Add two dialysis stations for a total of 15 stations upon completion 12/12/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 301 KB)
Rockingham G-010337-14 Rockingham Kidney Center Add 2 dialysis stations for a total of 19 dialysis stations 12/09/2014 Conditional Approval (PDF, 204 KB) Findings (PDF, 508 KB)
Wake J-010331-14 Fresenius Medical Central Raleigh Add four dialysis stations for a total of 19 dialysis stations upon completion 12/22/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 528 KB)

November 2014

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Cabarrus F-010311-14 Cabarrus Manor Change of scope and cost overrun for Project ID #F-10263-14 by relocating 48 adult care home beds to the previously approved 60-bed replacement adult care home 11/20/2014 Conditional Approval (PDF, 206 KB) Findings (PDF, 421 KB)
Cumberland M-010294-14 Cape Fear Valley Medical Center Add 34 acute care beds 11/12/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 422 KB)
Durham J-010319-14 East Durham Dialysis Develop a new 10-station dialysis facility by relocating 7 stations from Durham Dialysis Center and 3 from Durham West Dialysis Center 11/13/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 377 KB)
Guilford G-010298-14 Fellowship Hall Convert 39 supervised living beds to 39 residential chemical dependency treatment beds 11/04/2014 Conditional Approval (PDF, 200 KB) Findings (PDF, 556 KB)
Guilford G-010338-14 Northwest Greensboro Kidney Center Add 8 stations for a total of 33 dialysis stations 11/14/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 497 KB)
Moore H-010296-14 FirstHealth Moore Reg. Hosp. and Pinehurst Treatment Add 25 acute care beds 11/20/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 398 KB)
Pitt Q-010315-14 FMC Farmville Develop a new 10-station dialysis facility by relocating 7 stations from FMC Dialysis Services East Carolina University and 3 from Greenville Dialysis Center 11/03/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 543 KB)
Randolph G-010355-14 MRI of Asheboro Develop a diagnostic center which is a change of scope for Project ID #G-8342-09 (acquire a 2nd MRI scanner) 11/06/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 461 KB)
Wake J-010300-14 The Prostate Health Center Acquire one additional linear accelerator for a total of two 11/20/2014 Denied (PDF, 172 KB) Findings (PDF, 458 KB)
Wake J-010301-14 Universal Health Care/North Raleigh Relocate 20 nursing facility beds from Universal/Nash for a total of 132 NF beds upon completion 11/26/2014 Conditional Approval (PDF, 202 KB) Findings (PDF, 438 KB)
Wake J-010302-14 Universal Health Care/Fuquay-Varina Relocate 31 nursing facility beds from Universal/Nash for a total of 100 NF beds upon completion 11/26/2014 Denied (PDF, 172 KB) Findings (PDF, 454 KB)
Wake J-010303-14 Litchford Falls Healthcare and Rehabilitation Center Renovate existing combination facility and create new assisted living facility with 75 adult care home beds (relocate 24 beds from Litchford, 20 beds from Universal Health care/North Raleigh, and 31 beds from Universal Health Care/Fuquay Varina) 11/26/2014 Denied (PDF, 172 KB) Findings (PDF, 425 KB)
Wake J-010308-14 Universal Health Care-Wake Forest Construct a new 119-bed nursing facility by relocating 90 beds from Litchford Falls Health and Rehabilitation, 9 beds from Universal Health Care/Nash, and 20 beds from Universal Health Care/Oxford 11/26/2014 Conditional Approval (PDF, 204 KB) Findings (PDF, 447 KB)
Wake J-010342-14 BMA of Zebulon Add 5 dialysis stations for a total of 28 dialysis stations upon completion of this project and Project ID #K10099-13 (relo 7 stations to Franklin County) 11/14/2014 Conditional Approval (PDF, 200 KB) Findings (PDF, 489 KB)

October 2014

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Alexander E-010289-14 Alexander Youth Services Develop a new 15 bed child/adolescent chemical dependency treatment (substance abuse) hospital 10/28/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 484 KB)
Guilford G-010286-14 Hospice and Palliative Care of Greensboro-Beacon Place Convert 3 hospice residential beds to 3 hospice inpatient beds for a total of 11 hospice inpatient beds and 3 hospice residential beds upon project completion 10/28/2014 Conditional Approval (PDF, 200 KB) Findings (PDF, 316 KB)
Mecklenburg F-010287-14 OrthoCarolina Ballantyne Acquire one fixed MRI scanner 10/28/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 1003 KB)
Mecklenburg F-010292-14 Novant Health Mint Hill Medical Center Acquire one fixed MRI scanner 10/28/2014 Denied (PDF, 197 KB) Findings (PDF, 1003 KB)
Mecklenburg F-010360-14 Charlotte Surgery Center, LP Relocate ambulatory surgery facility with seven ORs and one procedure room, and add three procedure rooms 10/23/2014 App Withdrawn  
New Hanover O-010324-14 New Hanover Dialysis Develop a new 12-station dialysis facility by relocating 10 stations from Southeastern Dialysis Center-Wilmington and two stations from Cape Fear Dialysis Center 10/02/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 456 KB)
Orange J-010314-14 University of North Carolina Hospitals Acquire ninth MRI scanner 10/10/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 475 KB)
Robeson N-010321-14 Maxton Dialysis Relocate St Pauls Dialysis Center and change the name to Maxton Dialysis 10/29/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 544 KB)
Rockingham G-010309-14 Annie Penn Hospital Add one GI endoscopy room to existing space for a total of 3 licensed GI endoscopy rooms upon completion 10/28/2014 Conditional Approval (PDF, 202 KB) Findings (PDF, 462 KB)
Surry G-010310-14 Mountain Valley Hospice and Palliative Care Develop three additional hospice inpatient beds in existing facility 10/29/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 494 KB)

September 2014

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Brunswick O-010305-14 Leland Dialysis Develop a new facility by relocating 8 dialysis stations from Southeastern Dialysis Center-Shallotte and 2 stations from Southport Dialysis Center for a total of 10 dialysis stations upon completion 09/30/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 481 KB)
Burke E-010330-14 BMA Burke County Relocate the entire dialysis facility and add three dialysis stations for a total of 28 stations 09/30/2014 Application Withdrawn  
Durham J-010307-14 Veritas Collaborative Develop 25 new adult, inpatient, psychiatric beds dedicated to eating disorder treatment, pursuant to a need determination in the 2014 SMFP 09/19/2014 Conditional Approval (PDF, 206 KB) Findings (PDF, 499 KB)
Henderson B-010312-14 Winchester House Develop a new 40-bed adult care home as a replacement for two separate adult care home facilities 09/26/2014 Conditional Approval (PDF, 202 KB) Findings (PDF, 332 KB)
Johnston J-010281-14 Clayton Endoscopy Develop a new ambulatory surgical facility with two GI endoscopy procedure rooms 09/26/2014 Conditional Approval (PDF, 202 KB) Findings (PDF, 518 KB)
Martin Q-010299-14 Martin General Hospital Develop one dedicated C-section operating room in existing facility 09/17/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 525 KB)
Moore H-010297-14 Inn at Quail Haven Village Convert 10 nursing facility beds to Adult Care Home beds 09/05/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 329 KB)
Robeson N-010284-14 Community Outreach Youth Services Develop a new 8-bed non-medical child/adolescent chemical dependency residential treatment facility 09/26/2014 Denied (PDF, 197 KB) Findings (PDF, 346 KB)
Wake J-010280-14 Rex Hospital Wakefield Obtain a separate license for Rex Hospital Wakefield as an ambulatory surgical facility to be known as Rex Surgery Center of Wakefield 09/19/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 384 KB)
Wayne P-010306-14 Wayne Assisted Living Construct a replacement facility for a 104-bed adult care home 09/26/2014 Conditional Approval (PDF, 202 KB) Findings (PDF, 397 KB)

August 2014

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Caldwell E-010261-14 Caldwell Surgery Center Develop freestanding ambulatory surgical facility by relocating 3 ORs from the hospital license and add 1 procedure room 08/28/2014 Denied (PDF, 196 KB) Findings (PDF, 1.03 MB)
Cumberland M-010304-14 BMA Fayetteville Relocate entire facility 08/01/2014 Conditional Approval (PDF, 200 KB) Findings (PDF, 304 KB)
Martin Q-010279-14 Dialysis Care of Martin County Cost overrun on Project ID #Q-10103-13 (add 2 dialysis stations) 08/14/2014 Conditional Approval (PDF, 200 KB) Findings (PDF, 117 KB)
Nash L-010295-14 South Village Relocate 100 nursing facility beds and 15 adult care home beds to a newly constructed facility 08/22/2014 Conditional Approval (PDF, 203 KB) Findings (PDF, 440 KB)
New Hanover O-010278-14 Southeastern Dialysis Center Cost overrun for Project ID #O-8401-09 (renovate and add eight stations to existing dialysis facility) 08/01/2014 Conditional Approval (PDF, 201 KB) Findings (PDF, 337 KB)
Onslow P-010266-14 Southeastern Dialysis Center of Jacksonville Add 1 dialysis station for a total of 25 stations upon completion of this project and P-10123-13 08/28/2014 Conditional Approval (PDF, 200 KB) Findings (PDF, 358 KB)
Randolph G-010254-14 BMA Asheboro Relocate 2 stations from BMA South Greensboro in Guilford County to BMA Asheboro for a total of 48 dialysis stations upon completion 08/28/2014 Denied (PDF, 173 KB) Findings (PDF, 718 KB)
Randolph G-010262-14 N Randolph Dialysis Center of Wake Forest University Develop 10-station dialysis facility by relocating 10 stations from High Point Kidney Center in Guilford County 08/28/2014 Conditional Approval (PDF, 202 KB) Findings (PDF, 718 KB)
Sampson M-010243-14 Rolling Ridge Assisted Living Relocate 19 adult care home beds from Hannah McCoy Center to Rolling Ridge Assisted Living 08/28/2014 Conditional Approval (PDF, 204 KB) Findings (PDF, 444 KB)

July 2014

County Project I.D. # Facility Type of Project Date of Decision Decision Findings
Buncombe B-010272-14 Asheville Kidney Center Add 2 dialysis stations for a total of 52 stations upon completion 07/24/2014 Denied (PDF, 219 KB) Findings (PDF, 314 KB)
Durham J-010240-14 Veritas Collaborative, LLC Develop one new child/adolescent inpatient psychiatric bed pursuant to the need determination in the 2014 SMFP 07/25/2014 Conditional Approval (PDF, 251 KB) Findings (PDF, 324 KB)
Durham J-010282-14 East Durham Dialysis Develop a new 10-station dialysis facility by relocating 7 stations from Durham Dialysis Center and 3 stations from Durham West Dialysis Center 07/11/2014 Denied (PDF, 217 KB) Findings (PDF, 331 KB)
Forsyth G-010242-14 Arbor Acres United Methodist Retirement Community Inc Add 18 new nursing facility beds pursuant to Policy NH-2 and 4 adult care home beds pursuant to Policy LTC-1 for a total of 83 nursing facility and 106 adult care home beds upon completion 07/17/2014 Conditional Approval (PDF, 250 KB) Findings (PDF, 344 KB)
Forsyth G-010291-14 Salemtowne Replace nursing facility and develop 16 additional nursing facility beds pursuant to Policy NH-2 and 20 memory support adult care home beds pursuant to Policy LTC-1 07/31/2014 Conditional Approval (PDF, 250 KB) Findings (PDF, 385 KB)
Guilford G-010285-14 Hospice of the Piedmont, Inc. Convert 5 hospice residential beds to 5 hospice inpatient beds for a total of 15 hospice inpatient beds and 3 hospice residential beds upon project completion 07/31/2014 Conditional Approval (PDF, 245 KB) Findings (PDF, 366 KB)
Mecklenburg F-010270-14 Charlotte East Dialysis Center Add two dialysis stations for a total of 26 dialysis stations upon completion 07/15/2014 Conditional Approval (PDF, 245 KB) Findings (PDF, 314 KB)
Mecklenburg F-010290-14 Cuthbertson Village at Aldersgate Develop 16 additional memory support adult care home beds pursuant to Policy LTC-1 07/31/2014 Conditional Approval (PDF, 249 KB) Findings (PDF, 226 KB)
Mecklenburg F-010293-14 Aldersgate Skilled Nursing Facility Replace existing nursing facility and develop 20 additional nursing facility beds pursuant to Policy NH-2 07/31/2014 Conditional Approval (PDF, 249 KB) Findings (PDF, 321 KB)
Robeson N-010283-14 Maxton Dialysis Relocate St Pauls Dialysis Center and rename it 07/11/2014 Denied (PDF, 218 KB) Findings (PDF, 435 KB)
Sampson M-010253-14 Fresenius Medical Care of Roseboro Add 3 dilaysis stations to existing facility for a total of 13 dialysis stations at completion 07/01/2014 Conditional Approval (PDF, 246 KB) Findings (PDF, 399 KB)